Address: 43 Ossie Urban Street, Tamsui Industria, George, 6529, South Africa
  • Home
  • BOSCO Edenvale 120kWh/60kVA Back-up System

BOSCO Edenvale 120kWh/60kVA Back-up System

120KWH/60KVA BOSCO Back-up and Peak Shaving System

12 x Redflow ZBM 2 (240kg – 10kWh per battery) batteries in conjunction with 6 x 10KVA Victron Inverter Chargers, ( 20KVA Per Phase)were installed at BOSCO printed circuits to assist with load shedding and also peak shaving in Edenvale, Gauteng Province, South Africa. The Victron energy system will be running a Hub2 System with 3x 17KVA SMA Grid-tie Inverters connected to the output of the Victron Quattro inverters.

The full Installation of the battery and Victron System took 4 days to complete. Redflow batteries were supplied and fitted by Specialized Solar Systems. The Victron equipment was supplied and fitted by Soventix.

Peak shaving is the process of reducing the amount of energy purchased from the utility company during peak hours when the charges are highest. Many businesses are paying for their electricity consumption on a time-of-use basis.

For more info contact info@specializedsolarsystems.co.za

battery, Energy, red flow, solar, Specialized Solar Systems, SSS

Company

Contact Us

t:+27(0)44 878 1126
e:info@specializedsolarsystems.co.za
Please note: Errors and omissions excepted (E&OE)
 
Copyright © 2008-2018 Specialized Solar Systems 
All rights Reserved by Specialized Solar Systems
 
Specialized Solar Systems (Registered trademark)
The National Alterhnative Energy Supply Company (Registered trademark)